The Last Working Jobsite for Minnich Mechanical Design

Share With:

After 38 years in the hydronics business, Stephen Minnich of Minnich Mechanical Design is hanging up the tools. The Hub’s John Mesenbrink caught up to Stephen on his last jobsite, a 24-zone radiant system at an apartment complex in Wheaton, Ill. The change-out consisted of removing two 400,000 BTU cast-iron boilers with no boiler protection and no mixing among other hydronic issues that cut down the life of the boilers by 10+ years.

Minnich is installing for two Lochinvar KBN models, an upgrade from their KHN models to remedy the problem. Check out the video here.

https://youtu.be/EjBc-NZO5dE

 

As far as what Minnich will do in the next chapter of his career, Minnich has accepted a position with an engineering firm downtown Chicago as an HVAC consultant for multi-residential units on the Chicago area. Congrats on a great career and good luck with the next chapter in your life!

See the video here:

Join the conversation: